Pohl Group provides civil and structural works for substations, utilities and grid infrastructure in Callide and the Callide Valley, working alongside electrical contractors and network operators. See all our power infrastructure civil works locations, or our power infrastructure civil works in Wagga Wagga, where our depot is based.

Pohl Group power infrastructure civil works crew on site Australia
Pohl Group power infrastructure contractor early enabling works NSW

Several Central Queensland transmission projects start at Calvale Substation, near Callide Power Station. Powerlink's new 87 km 275 kV double-circuit line runs from Calvale to Calliope River Substation, mostly in existing easements, with upgrades at both substations.

OUR CAPABILITIES INCLUDE:

01

Substation earthworks and site preparation

Pohl Group civil contractor power infrastructure project Western Australia

02

HV, MV & LV Trenching & Conduit Installation

03

Structural Concrete & FRP Works

04

Steel Structure Installation

05

Earthing Grid Installation & Testing

06

Security Fencing, Access Control & Civil Interfaces

WE UNDERSTAND THE REQUIREMENTS OF WORKING IN LIVE ENVIRONMENTS AND OPERATE WITH STRICT ADHERENCE TO SAFETY, COMPLIANCE, AND QUALITY STANDARDS IN CALLIDE.

OUR DELIVERY APPROACH ENSURES:

Pohl Group power infrastructure civil works crew on site Australia

Strong coordination with electrical contractors and network operators

Pohl Group power infrastructure contractor early enabling works NSW

Full QA/QC processes including ITPs, inspections, and as-built
documentation

On-time, on-budget project completion