Power Infrastructure Civil Works in Narrandera
Pohl Group provides civil and structural works for substations, utilities and grid infrastructure in Narrandera and the surrounding Riverina, working alongside electrical contractors and network operators. See all our power infrastructure civil works locations, or our power infrastructure civil works in Wagga Wagga, where our depot is based.


OX2's 100 MW Sandigo Solar Farm, 28 km south-east of Narrandera, was sited for its proximity to the Transgrid network, and the proposed Narrandera Solar Hybrid would connect through an onsite substation to existing 330 kV lines.
OUR CAPABILITIES INCLUDE:
01
Substation earthworks and site preparation

02
HV, MV & LV Trenching & Conduit Installation
03
Structural Concrete & FRP Works
04
Steel Structure Installation
05
Earthing Grid Installation & Testing
06
Security Fencing, Access Control & Civil Interfaces
WE UNDERSTAND THE REQUIREMENTS OF WORKING IN LIVE ENVIRONMENTS AND OPERATE WITH STRICT ADHERENCE TO SAFETY, COMPLIANCE, AND QUALITY STANDARDS IN NARRANDERA.
OUR DELIVERY APPROACH ENSURES:

Strong coordination with electrical contractors and network operators

Full QA/QC processes including ITPs, inspections, and as-built
documentation
On-time, on-budget project completion