top of page

Power Infrastructure Civil Works in Narrandera

Pohl Group provides civil and structural works for substations, utilities and grid infrastructure in Narrandera and the surrounding Riverina, working alongside electrical contractors and network operators. See all our power infrastructure civil works locations, or our power infrastructure civil works in Wagga Wagga, where our depot is based.

Pohl Group power infrastructure civil works crew on site Australia
Pohl Group power infrastructure contractor early enabling works NSW

OX2's 100 MW Sandigo Solar Farm, 28 km south-east of Narrandera, was sited for its proximity to the Transgrid network, and the proposed Narrandera Solar Hybrid would connect through an onsite substation to existing 330 kV lines.

OUR CAPABILITIES INCLUDE:

01

Substation earthworks and site preparation

Pohl Group civil contractor power infrastructure project Western Australia

02

HV, MV & LV Trenching & Conduit Installation

03

Structural Concrete & FRP Works

04

Steel Structure Installation

05

Earthing Grid Installation & Testing

06

Security Fencing, Access Control & Civil Interfaces

WE UNDERSTAND THE REQUIREMENTS OF WORKING IN LIVE ENVIRONMENTS AND OPERATE WITH STRICT ADHERENCE TO SAFETY, COMPLIANCE, AND QUALITY STANDARDS IN NARRANDERA.

OUR DELIVERY APPROACH ENSURES:

Pohl Group power infrastructure civil works crew on site Australia

Strong coordination with electrical contractors and network operators

Pohl Group power infrastructure contractor early enabling works NSW

Full QA/QC processes including ITPs, inspections, and as-built
documentation

On-time, on-budget project completion

bottom of page